Built on purpose.
Remodels, additions and light commercial work. Scheduled in the open, finished in the punch list.
- Since 2008
- San Antonio yard
- Homes and light commercial
Jobs you can walk through.
A kitchen and 420 square feet added to a 1962 ranch.
White oak cabinets built by our trim crew, poured counters, and a plaster hood. The family stayed in the house the whole time.
- 2025 · ROOFING
Alamo Heights reroof
Standing seam over a new deck. Nine working days, tarps down every night.
- 2024 · TENANT FINISH-OUT
Broadway dental suite
2,100 square feet, six operatories, open on the date in the lease.
- 2023 · SITE WORK
Helotes fence and drive
640 feet of cedar, a culvert, and a gravel drive that still drains.
What we take on.
One contract, one schedule, one person to call. We self-perform framing and trim and bring in trades we have worked with for years.
Remodeling and additions
Whole-house remodels and room additions. We price from drawings, flag what we cannot see behind the walls, and tell you what that could cost before we open them.
Kitchens
Layout, cabinets, counters, and the electrical and plumbing behind them. Most kitchens run eight to twelve weeks.
Roofing
Metal and shingle reroofs, deck repair, and flashing done right the first time.
Fencing and site work
Cedar and steel fence, drives, drainage, and pads for whatever is going on top.
Selective demolition
Taking out only what needs to go, and protecting everything that stays.
Tenant finish-out
Offices, clinics and small retail, built to the lease date.
How a Westfork job runs.
Walk the site
Javi or a superintendent walks it with you before any number is written down.
Price in the open
Line items you can read, with allowances marked as allowances.
Sequence the trades
A week-by-week schedule on paper. Weather days are built in.
Keep a clean site
Swept daily, materials stacked, neighbors told what is coming.
Punch it honestly
We write the punch list with you and do not call it done until it is.
A clean site is a kind of respect.
Javi Reyes spent twelve years as a superintendent before starting Westfork in 2008. He wanted to run jobs the way he wished every site was run. He still walks sites on Mondays and Thursdays, usually before the first trade shows up.
"Dana sent a schedule on day one. Sixteen weeks later, they were off by two days, and she had told us about both." Rachel, kitchen addition
Walk the site with us.
(210) 555-0188 1800 Westfork Lane, San Antonio, TX 78227office@westforkbuild.example
Monday to Friday, 7 to 4