Two builders reviewing plans in front of a timber and steel frame at golden hour
General contractor · San Antonio

Built on purpose.

Remodels, additions and light commercial work. Scheduled in the open, finished in the punch list.

  • Since 2008
  • San Antonio yard
  • Homes and light commercial
Work

Jobs you can walk through.

A finished white oak kitchen with concrete counters
Southside addition, 2024

A kitchen and 420 square feet added to a 1962 ranch.

White oak cabinets built by our trim crew, poured counters, and a plaster hood. The family stayed in the house the whole time.

16weeks, start to punch
1weather delay
3change orders, all priced first
  • 2025 · ROOFING

    Alamo Heights reroof

    Standing seam over a new deck. Nine working days, tarps down every night.

  • 2024 · TENANT FINISH-OUT

    Broadway dental suite

    2,100 square feet, six operatories, open on the date in the lease.

  • 2023 · SITE WORK

    Helotes fence and drive

    640 feet of cedar, a culvert, and a gravel drive that still drains.

Services

What we take on.

One contract, one schedule, one person to call. We self-perform framing and trim and bring in trades we have worked with for years.

Remodeling and additions

Whole-house remodels and room additions. We price from drawings, flag what we cannot see behind the walls, and tell you what that could cost before we open them.

Kitchens

Layout, cabinets, counters, and the electrical and plumbing behind them. Most kitchens run eight to twelve weeks.

Roofing

Metal and shingle reroofs, deck repair, and flashing done right the first time.

Fencing and site work

Cedar and steel fence, drives, drainage, and pads for whatever is going on top.

Selective demolition

Taking out only what needs to go, and protecting everything that stays.

Tenant finish-out

Offices, clinics and small retail, built to the lease date.

Method

How a Westfork job runs.

  1. Walk the site

    Javi or a superintendent walks it with you before any number is written down.

  2. Price in the open

    Line items you can read, with allowances marked as allowances.

  3. Sequence the trades

    A week-by-week schedule on paper. Weather days are built in.

  4. Keep a clean site

    Swept daily, materials stacked, neighbors told what is coming.

  5. Punch it honestly

    We write the punch list with you and do not call it done until it is.

A crew setting a cedar fence on a Texas lot
Work in progress: setting cedar posts in Helotes, week two.
Crew

A clean site is a kind of respect.

Javi Reyes spent twelve years as a superintendent before starting Westfork in 2008. He wanted to run jobs the way he wished every site was run. He still walks sites on Mondays and Thursdays, usually before the first trade shows up.

Javi ReyesFounder and principal
Dana ReyesOperations and client communication
Luis MoraSuperintendent
Heather PlattSuperintendent
"Dana sent a schedule on day one. Sixteen weeks later, they were off by two days, and she had told us about both." Rachel, kitchen addition
Contact

Walk the site with us.

(210) 555-0188
1800 Westfork Lane, San Antonio, TX 78227
office@westforkbuild.example
Monday to Friday, 7 to 4